hey there!
we have some problems with the OverLoad Package but we are sure, that they are not directly bound to only this package. Or maybe they are?
We get our energy from some solar panels which are connected to a MFSU. The 2048 EU/t of this unit are being put into an HV-Transformer (using the HV cables, of course). Then the energy is transfered down again using an MV-Transformer. This unit provides energy for several units including two...
GregTech's Machines exploding due package overload?!
we have some problems with the OverLoad Package but we are sure, that they are not directly bound to only this package. Or maybe they are?
We get our energy from some solar panels which are connected to a MFSU. The 2048 EU/t of this unit are being put into an HV-Transformer (using the HV cables, of course). Then the energy is transfered down again using an MV-Transformer. This unit provides energy for several units including two...
GregTech's Machines exploding due package overload?!